ConceptKeystone Builders · invented business by WebShift Studios.

LabBuild this
Aerial view of a house being framed at sunset, lumber stacked beside it
Design-build · Est. 2009140+ remodels · 4.9 ★ average

The remodel you can see coming.

Built right, shown plainly. A budget range before we meet, a fixed price before we start, and a portal that shows you every week of the build.

  • Fixed-price proposals
  • Same crew, start to finish
  • Weekly photo updates
New wiring run through a cable tray during electrical rough-inThis week · electrical rough-in

Client portal

Live

The Alvarez kitchen

52%

Rough-in · inspection Thursday · 2 approvals waiting

Portrait of the project manager in a yellow hard hat and plaid shirt
Sam OkaforProject manager
Open the portal →
Remodels completed
140+
Average client rating
4.9 ★
Building on the east side since
2009
Fixed-price proposals
100%

Project configurator

A real budget range in five steps.

Answer the same questions we ask on a first call. You get a range, a timeline, and a starting scope you can bring to the site visit.

  1. 1Project
  2. 2Size & scope
  3. 3Finish
  4. 4Timeline
  5. 5Estimate

Step 1

What are we building?

Pick the closest match — we will refine it together.

Ranges are planning numbers from our current rate table, not a quote. A site visit turns them into a fixed-price proposal.

Completed work

Drag the handle. That is the whole pitch.

Four recent projects, photographed the week we handed over the keys. The slider works with a mouse, a finger, or the arrow keys.

  • AfterAfter
    BeforeBefore

    Maple Street kitchen

    Kitchen
    Size
    240 sq ft
    Duration
    9 weeks
    Finish
    Premium

    A galley kitchen with one window became an open room with an island, a wall of pantry storage, and morning light on the counters. We took down a load-bearing wall with a flush beam so the ceiling reads as one plane.

  • AfterAfter
    BeforeBefore

    Ridgeview primary bath

    Bathroom
    Size
    95 sq ft
    Duration
    6 weeks
    Finish
    Luxury

    The tub nobody used became a curbless shower with a linear drain, and the vanity doubled in length. Heated floors, a fog-free mirror, and a pocket door to win back the swing space.

  • AfterAfter
    BeforeBefore

    Elm Court addition

    Addition
    Size
    520 sq ft
    Duration
    18 weeks
    Finish
    Standard

    A two-storey family room and studio off the side of a 1920s brick semi. Black standing-seam siding and cedar so the new volume reads as deliberate, not disguised — and the old porch stays exactly as it was.

  • AfterAfter
    BeforeBefore

    Birch Lane ADU

    ADU
    Size
    640 sq ft
    Duration
    26 weeks
    Finish
    Premium

    An unused corner of the yard became a one-bedroom cottage for a parent moving closer. Own meter, own entrance, floor-to-ceiling glass onto a private patio that faces away from the main house.

Client portal

See where your build stands without calling.

Every client gets a page like this one. Phases, weekly photos, decisions waiting on you, and the paperwork — in one place.

Demo project · no login needed

Active project

The Alvarez kitchen

418 Maple Street

Portrait of the project manager in a yellow hard hat and plaid shirt

Sam Okafor

Your project manager · on site Mon–Fri · replies within the hour

Overall progress52%
Started
Aug 3, 2026
Target
Oct 16, 2026
Days left
37
Budget used
49%
$41,200 of $84,500

Phases

  1. DesignComplete
  2. DemoComplete
  3. Rough-in60%
  4. FinishesUpcoming
  5. Punch listUpcoming

Weekly updates

Every Monday, from the site
  1. New wiring run through a cable tray during electrical rough-in

    Sep 7, 2026 · Sam Okafor

    Week 6 — electrical roughed in, inspection Thursday

    All new circuits are pulled, including the dedicated lines for the range and the island outlets. Plumbing for the relocated sink is stubbed. Inspector is scheduled Thursday morning; drywall follows if we pass, which we expect to.

  2. The room after the beam went in, drywall hung and taped

    Aug 31, 2026 · Sam Okafor

    Week 5 — beam is in, drywall hung

    The flush beam went in Tuesday and the temporary wall came down Wednesday. You can stand in the kitchen and see the dining room now. We found an old junction box hidden in the wall; it is being brought up to code as change order #2 (see Documents).

  3. Aug 24, 2026 · Sam Okafor

    Week 4 — subfloor repaired

    Two sections of subfloor near the old dishwasher were soft from a slow leak. Replaced and sistered the joist. No change to the schedule.

  4. Aug 10, 2026 · Sam Okafor

    Week 2 — demo complete

    Cabinets, counters, and the soffit are out and hauled. Dust walls are up at both doorways. Thanks for clearing the pantry — that saved us a morning.

  5. Rendering of the finished kitchen: grey cabinets, white island, three pendants

    Jul 24, 2026 · Sam Okafor

    Design signed off — final rendering

    Contract countersigned and the last rendering is attached: grey lowers, white island, the three pendants you picked. Cabinets are ordered today so they land the week finishes start.

Material samples laid out on a desk: stone, tile, wood, and fabric swatchesFinish selections · from your design meeting

Approvals needed

2 waiting

Backsplash tile

Needed by Sep 14 so it arrives before finishes

Countertop

Template happens right after cabinets land

Documents

  • ContractSignedSigned Jul 24 · PDF · 14 pages
  • Permit B-2026-0142IssuedIssued Jul 30 · Structural + electrical
  • Change order #2Awaiting signatureJunction box remediation · $640
Portrait of the project manager in a yellow hard hat and plaid shirt

Message Sam

Sam usually replies within the hour during the workday. Your note lands in the feed above.

A designer drafting on a roll of blueprint with an architect's scale
“Every drawing we hand you is the drawing the crew builds from. No translation step, no surprises on site.”
Portrait of the project manager in a yellow hard hat and plaid shirt
Sam Okafor, project manager

How we work

Four steps, no surprises.

The same four steps for a powder room and a second storey. You always know what comes next and what it costs.

  1. 01Configure

    5 minutes

    Five questions online give you a planning range and a starting scope before anyone visits.

  2. 02Site visit

    1 hour, free

    We measure, open a wall if we have to, and talk through what you actually want from the space.

  3. 03Fixed-price proposal

    Within 10 days

    A real number with allowances spelled out, a schedule, and a 3D walkthrough for larger jobs.

  4. 04Build, with updates

    Weeks, not months

    Weekly photo updates, approvals, and documents in your portal. Same crew start to finish.

Have a room in mind?

Five questions, a real range, and a site visit on the calendar — all before lunch.

Start a project

Keystone Builders

Licensed & insured · Residential remodeling, additions, and ADUs · Serving the east side since 2009.

Built to demonstrate

  • Configurator
  • Before / after
  • Customer portal

A WebShift Studios concept. Keystone Builders is not a real business; names, prices, and availability are sample data. See more concepts or talk to WebShift.